Metal finishing for Toledo and southern Michigan manufacturers

Toledo is about three hours straight down I-75 and southern Michigan an hour beyond it. At that range the work has to be worth the haul, so this page is about the jobs where it is.

Northwest Ohio and southern Michigan run to heavy vehicle assembly, large stamping, glass manufacturing and the equipment that serves them. The parts are physically bigger than the regional average: stampings, weldments, frames, fixtures and handling equipment, in lot sizes where a single part is worth handling individually rather than tumbling.

The drive from Este Avenue

A single road. I-75 runs from the plant to Toledo and on into southern Michigan.

From the plant toDistanceDrive
Limaabout 130 miabout 2 hr
Findlayabout 155 miabout 2 hr 20
Bowling Greenabout 180 miabout 2 hr 45
Toledoabout 200 miabout 3 hr
Monroe and Ann Arborabout 240 miabout 3 hr 40

Distances are approximate road mileage from 6350 Este Ave, Cincinnati, and drive times assume ordinary traffic.

Freight, and whether the trip is worth it

Three hours each way is real cost and this page will not pretend otherwise. What justifies it is consolidation. A part that needs washing, blasting, deburring and plating is one movement to Cincinnati against three or four vendor stops closer to home, and the finishing sequence is quoted and scheduled as a single job. Where only one process is needed and a local shop offers it, the local shop is usually the right answer. Where the sequence is long, or where the process is mechanical plating, the arithmetic changes.

Transit. About three hours to Toledo and closer to four into southern Michigan, each way. Lead time itself depends on the process and the lot size, so MFI quotes it per job rather than publishing one figure. Rush and hot orders are accommodated.

Questions from this market

It is practical when the job consolidates. One shipment covering a multi-process routing competes well against several shorter trips to separate vendors, and MFI quotes and schedules that sequence as one job. For a single process available locally, the shorter trip usually wins, and MFI will say so.

Zinc plating covers very small fasteners through to large stampings, and parts around 24 inches by 36 inches are well within range. Blasting handles bulk small geometry on tumble equipment through to heavy work hung at up to 2,000 lb per hook. Send the largest and smallest parts in the family and MFI will confirm both.

Request a quote on your part

Send the material, the volume and the finish specification. MFI will confirm the process, the lead time and the price.

513-641-5419Main line ยท 513-641-4193
info@mechfin.comQuotes and enquiries
6350 Este AveCincinnati, OH
ISO 9001 certifiedRegistered since 2002