Metal finishing for southeast Ohio and western West Virginia

The Ohio River corridor from Portsmouth through Huntington to Parkersburg is underserved by multi-process finishers. It also produces the kind of heavy, stored and weathered steel that needs one.

This corridor runs to chemical processing, energy and oilfield equipment, power generation and heavy fabrication. The work is large, often welded rather than machined, and a good deal of it sits outdoors or in unheated storage between fabrication and service. Stainless in chemical service brings its own requirement, because free iron left on the surface is where the corrosion starts.

The drive from Este Avenue

US-52 and OH-32 down the Ohio River, then I-64 east into West Virginia.

From the plant toDistanceDrive
Portsmouthabout 105 miabout 1 hr 50
Irontonabout 140 miabout 2 hr 20
Athensabout 150 miabout 2 hr 30
Huntingtonabout 150 miabout 2 hr 30
Marietta and Parkersburgabout 190 miabout 3 hr
Charlestonabout 200 miabout 3 hr 15

Distances are approximate road mileage from 6350 Este Ave, Cincinnati, and drive times assume ordinary traffic.

Freight, and whether the trip is worth it

Most of this corridor sits between two and three hours out, and the competing option is often not a nearer finisher at all. Multi-process finishing is thin on the ground here, which means work that needs blasting and passivating and plating is frequently split across distance anyway. Consolidating it into one routing is usually the shorter total journey, even when the single leg is longer.

Transit. Between roughly two and three and a quarter hours, depending where on the river you sit. Lead time itself depends on the process and the lot size, so MFI quotes it per job rather than publishing one figure. Rush and hot orders are accommodated.

Questions from this market

Often not. Surface rust can frequently be addressed by chemical or mechanical rust removal, and which is appropriate depends on the material, the geometry, how far the corrosion has gone and what has to happen to the part next. Send a photograph and MFI will tell you whether the lot is recoverable before you write it off.

Blasting handles bulk small geometry on tumble equipment through to heavy work hung at up to 2,000 lb per hook. Send the largest part in the family and MFI will confirm it against the equipment.

Yes, to the practice the specification calls for, under an ISO 9001:2015 quality system. Send the specification with the part and the documentation is quoted alongside the work.

Request a quote on your part

Send the material, the volume and the finish specification. MFI will confirm the process, the lead time and the price.

513-641-5419Main line ยท 513-641-4193
info@mechfin.comQuotes and enquiries
6350 Este AveCincinnati, OH
ISO 9001 certifiedRegistered since 2002